Minister Nimal Siripala de Silva has said that the reconstruction of the Polonnaruwa Batticaloa rail track will be completed within two years. The Minister said that this track will be further strengthened laying concrete sleepers. 10,000 such sleepers have been ordered. Accordingly concrete sleepers would be laid on the entire track and thereby increasing the
Post a Comment